Two Lot Sub Division, Balgowlah Heights

  • Client: Private Individual
  • Principal: Northern Group
  • Date: January 2015

Project Description

Northern Contracting Group was engaged as principle contractor by a private developer to undertake a 2 lot sub division.

The works included demolition of an existing 2 storey dwelling, including the removal of bonded asbestos.

Clearing of site (1200m2) which was heavily vegetated with large trees and shrubs.

Bulk excavation in Rock was then required to facility access for a new battle axe driveway to service both lots, and detailed excavation for the new common service trench.

Northern Group undertook the complete site servicing of all utilities for both lots i.e sewer, water, storm water , electrical , gas and comms, handing the site over ready for construction.

Once installed Northern Group constructed the new reinforced concrete driveway with integrated barrier kerb for completion of the project.

Once delivered the client was able to commence construction of two new dwellings with full services in place.