Evergreen Estate Housing Sub Division    

  • Client: Evergreen Developments Pty Ltd
  • Principal: Northern Group
  • Start Date: April 2014  End Date: April 2015

Project Description

The above mentioned projects commenced with the demolition and site clearing of a previously operational Tennis and Squash Facility. The site was occupied by a 2000m2 8 court squash center, 4 volley ball areas, and 10 tennis courts both synthetic and clay surfaces. The entire site area was approx. 25,000m2

In conjunction with the above, the site contained significant surface contamination of general solid waste that needed to be screened; for the purpose of disposal at the lowest possible cost, and the recyclable demolition materials were crushed on site for beneficial reuse in the road construction.

Once the site was cleared back to a clean pallet and validated, work commenced on a 34 lot housing sub division inclusive of 2000m2 landscaped riparian zone which was to be handed back to council at the completion of the project.

Northern Contracting Group managed the complete delivery of the project which was situated over the top of an existing 900mm dia sewer sub main requiring a minor bridge to be constructed both permanently and temporarily to allow works to be complete and sub division to be operational. Services constructed to connect to each lot include, sewer, water gas, communications and electrical reticulation. The site represents on the largest residential sub division projects on Sydney’s Northern Beaches in recent times.

The project spanned 10 months and was highly successful, completed in line with program and on budget.